Windward Layout Design Bus Air Conditioner

Product Details
Customization: Available
Function: Cooling & Heating
Control Mode: Electronically Controlled Pneumatic Adjusting
Still deciding? Get samples of US$ 7600/Piece
Request Sample
Gold Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
200000 square meters
Management System Certification
ISO 9000, IATF16949
  • Windward Layout Design Bus Air Conditioner
  • Windward Layout Design Bus Air Conditioner
  • Windward Layout Design Bus Air Conditioner
Find Similar Products

Basic Info.

Model NO.
KRBPB4-D
Temperature Adjustable Area
Double Areas
Cooling Type
Non-independent
Heating Type
Non-independent
Certification
ISO
Cooling Capacity
12kw~14kw
Recommended Bus Length
7.8-8.5m
Shell Material
Fiber Glass
Condenser Fan Quanity
3
Control System
Intelligent Computer Control
Noise
Low Noise
Brush Fan Motor or Brushless Fan Motor
Brushless Fan Motor
Transport Package
Polywood
Specification
2750*1860*230mm
Trademark
JINGYI
Origin
China
HS Code
8415200000
Production Capacity
50000set/Year

Product Description

Product Pic 
Windward Layout Design Bus Air Conditioner
Windward Layout Design Bus Air Conditioner
Windward Layout Design Bus Air Conditioner
Windward Layout Design Bus Air Conditioner

Product components

 
air conditioning model KRBPE8-B max cooling capacity(kw) 12-14
recommended bus type 7.8-8.5 meters max heating capacity(kw) 12
max condenser air flow
(m³/h)DC
5500(3) max evaporator air flow
(m³/h)DC
3200(4)
dimension(mm) 2750*1860*230 cooling average power consumption (kw) 5



Product feature
  1. Jingyi third-generation AC-DC electric passenger car air-conditioner products with high energy efficiency, high reliability
  2. The windward layout design uses the oncoming wind speed during running of the vehicle to enhance the heat exchange, which greatly improves the heat exchange efficiency of the condenser
  3. Beautiful apprearance, compact struture, convenient application in a limited installation space.
  4. DC brushless fan, small size, light weight, high efficiency, high reliability, long life and low noise.
  5. Full computer intelligent controller, modular design, high degree of automation control, Through the CAN bus and Internet communication cloud control technology, achieve remote control capabilities 
  6. In-vehicle air supply adopts stepless speed regulation: according to the temperature inside the car and the set temperature, the air vloume is automatically adjusted steplessly to improve passenger comfort and reduce energy consumption.

 


Real picture of production line 
 
Jingyi Group's Vehicle Air Conditioner manufacturing equiment capacity: 6 production lines for bus and
midibus air-conditioner unite (Annual production capacity of 50000 sets).
9 production lines for all kinds of product quanlity test, with more than 130sets equipments.
Entrtprise hardware facilities manufacturing equipment level in industry-leading position,
is domestic bus air-conditioning R&D and manufacturing base.


Windward Layout Design Bus Air Conditioner
Windward Layout Design Bus Air Conditioner
Windward Layout Design Bus Air Conditioner
Windward Layout Design Bus Air Conditioner



Domestic first-class product technology testing room




Windward Layout Design Bus Air Conditioner
Windward Layout Design Bus Air ConditionerWindward Layout Design Bus Air Conditioner
 

Company introduction

Windward Layout Design Bus Air Conditioner

 

 
 
 
Question& Answer


Q. 1: Are you manufactory or trade Company? 
We are the Manufactory specialized in air conditioning industry products for 31 years already. We have 4 bus air conditioning factories in Guangzhou, Guangdong province, China. Our factory have passed IS09001:2000, CCAP and ISO/TS 16949: 2000.
Also we had latest Technical Center and quality control testing department for purchasing products for clients.

Q. 2:  How to control quality? 
A, all the raw materials by IQC (Incoming Quality Control) before launch whole process into the process after the screening.
B, process each link in the process of IPQC (Input process quality control) patrol inspection.
C, after finished by QC full inspection before packing into the next process packaging.
D, OQC before shipment for each product to do full inspection.

Q. 3: How long can I expect to get the products? 
The delivery time is within 15-20 days once receipt of the deposit.
 
Q. 4: How to order? 
 
We need to know the following information for your order before sending you PI.
1) Product information-Quantity, Specification (Your size of buses, model of current use of buses (if have), city bus or coach, compressor bracket assembly and alternator needs)
2) Delivery time required.
3) Shipping information-Company name, Street address, Phone & Fax number, Destination sea port.
4) Forwarder's contact details if there's any in China.







 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier