Product feature
KBL90T are Bottom-mounted unit. It is driven by vehicle engine, and can meet transportation cooling requirements of mid-size for 42-60m3, Condenser is set at the carrige bottom, Evaporator with Super-thin design. Use refrigerant R134a/ R404a, is Cost-effective, high energy efficiency
Main Technical Specification
unit model |
KBL90T |
applicable temperature |
-18~20ºC |
applicable volume |
42-60m3 |
cooling capacity (0ºC) |
7500/6818(w) |
cooling capacity (-18ºC) |
4500/5000(w) |
compressor model |
DKS32 |
compressor lubrication oil |
RL68H |
refrigerant & volume |
R404A/4.3(KG) |
condenser type |
Gilled tubed type |
condenser fan type |
Axial |
condenser number |
2 |
condenser voltage(V) |
12/24 |
evaporator type |
Gilled tubed type |
evaporator fan type |
centrifugal |
evaporator number |
3 |
evaporator voltage(V) |
12/24 |
evaporator dimension |
1223*652*330mm |
condenser dimension |
1305*435*475mm |
evaporator assembly weight |
38kg |
condenser assembly weight |
58kg |
Product Pic
Guangzhou Jingyi auto air conditioner introduction
Jingyi Group's Vehicle Air Conditioner manufacturing equiment capacity: 6 production lines for bus and
midibus air-conditioner unite (Annual production capacity of 50000 sets).
9 production lines for all kinds of product quanlity test, with more than 130sets equipments.
Entrtprise hardware facilities manufacturing equipment level in industry-leading position,
is domestic bus air-conditioning R&D and manufacturing base.
production line
The refrigerated truck has been installed, ready to be delivered to customers
Question& Answer
Q. 1: Are you manufactory or trade Company?
We are the Manufactory specialized in air conditioning industry products for 31 years already. We have 4 bus air conditioning factories in Guangzhou, Guangdong province, China. Our factory have passed IS09001:2000, CCAP and ISO/TS 16949: 2000.
Also we had latest Technical Center and quality control testing department for purchasing products for clients.
Q. 2: How to control quality?
A, all the raw materials by IQC (Incoming Quality Control) before launch whole process into the process after the screening.
B, process each link in the process of IPQC (Input process quality control) patrol inspection.
C, after finished by QC full inspection before packing into the next process packaging.
D, OQC before shipment for each product to do full inspection.
Q. 3: How long can I expect to get the products?
The delivery time is within 15-20 days once receipt of the deposit.
Q. 4: How to order?
We need to know the following information for your order before sending you PI.
1) Product information-Quantity, Specification (Your size of buses, model of current use of buses (if have), city bus or coach, compressor bracket assembly and alternator needs)
2) Delivery time required.
3) Shipping information-Company name, Street address, Phone & Fax number, Destination sea port.
4) Forwarder's contact details if there's any in China.