Guangzhou Jingyi auto air conditioner introduction
Jingyi Group's Vehicle Air Conditioner manufacturing equiment capacity: 6 production lines for bus and
midibus air-conditioner unite (Annual production capacity of 50000 sets).
9 production lines for all kinds of product quanlity test, with more than 130sets equipments.
Entrtprise hardware facilities manufacturing equipment level in industry-leading position,
is domestic bus air-conditioning R&D and manufacturing base.
production line
Product detail
Product feature
1. KBL35YDD include scroll compressor, condenser, evaporator, expansion valve, sight glass, drier, eletromagnetic valve, pressure valva, inverter and control system etc. The vehicle high voltage battery power is transferred into voltage suitble for scroll compressor by inverter. The fans , blowers and control system are powered by vehicle low voltage DC battery.
2. The scroll compressor is integrated with condenser, which is streamline design, Ultra-thin design is applied for evaporator. Both casing are made of fiberglass.
3. The scroll compressor voltage is 380V AC/3/50Hz. Fan , blower and control system voltage is 12V DC or 24V DC.
4. Environmental friendly R404A refrigerant is applied, high EER and energy saving.
5. KBL35YDD are suitable 16-22m³ cold chamber, with temperature range of -18~15ºC.
6. The condenser and compressor is roof mounted, while the evaporator is inside mounted.
Question& Answer
Q. 1: Are you manufactory or trade Company?
We are the Manufactory specialized in air conditioning industry products for 31 years already. We have 4 bus air conditioning factories in Guangzhou, Guangdong province, China. Our factory have passed IS09001:2000, CCAP and ISO/TS 16949: 2000.
Also we had latest Technical Center and quality control testing department for purchasing products for clients.
Q. 2: How to control quality?
A, all the raw materials by IQC (Incoming Quality Control) before launch whole process into the process after the screening.
B, process each link in the process of IPQC (Input process quality control) patrol inspection.
C, after finished by QC full inspection before packing into the next process packaging.
D, OQC before shipment for each product to do full inspection.
Q. 3: How long can I expect to get the products?
The delivery time is within 15-20 days once receipt of the deposit.
Q. 4: How to order?
We need to know the following information for your order before sending you PI.
1) Product information-Quantity, Specification (Your size of buses, model of current use of buses (if have), city bus or coach, compressor bracket assembly and alternator needs)
2) Delivery time required.
3) Shipping information-Company name, Street address, Phone & Fax number, Destination sea port.
4) Forwarder's contact details if there's any in China.